{"id":14827,"date":"2025-10-24T15:53:45","date_gmt":"2025-10-24T15:53:45","guid":{"rendered":"https:\/\/rpower.energy\/?p=14827"},"modified":"2025-10-24T15:54:19","modified_gmt":"2025-10-24T15:54:19","slug":"current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o","status":"publish","type":"post","link":"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/","title":{"rendered":"Current Report No. 22\/2025 \u2013 ESPI \u2013 Execution of a General Contracting Agreement with Nomad Electric sp. z o.o. and Esix sp. z o.o."},"content":{"rendered":"<p>The Management Board of R.Power S.A., with its registered office in Warsaw (the \u201c<strong>Issuer<\/strong>\u201d), informs that on October 24, 2025, a subsidiary of the Issuer (the \u201c<strong>Subsidiary<\/strong>\u201d) entered into an agreement with a consortium of contractors consisting of Nomad Electric sp. z o.o., based in Warsaw, and Esix sp. z o.o., based in Wroc\u0142aw (the \u201c<strong>Contractors<\/strong>\u201d), for the general execution of an investment project (the \u201cAgreement\u201d).<\/p>\n<p>The subject of the Agreement is the comprehensive execution of Balance of Plant (BoP) works and the commissioning of an energy storage system (BESS) with a target capacity of 150 MW\/300 MWh, together with the necessary accompanying infrastructure, as well as the construction of a main substation (GPO) 110 kV and a high-voltage line for the energy storage facility.<br \/>\nThe scope of work includes, in particular, the preparation of detailed design documentation, the supply of materials and equipment (excluding the energy storage system), the execution of construction and assembly works, start-up and functional testing of the installation, and the handover of the completed facility for operation.<\/p>\n<p>The Agreement provides for a lump-sum remuneration, the total value of which does not exceed 10% of the Issuer\u2019s equity.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Legal basis:<\/strong> Article 17(1) of the MAR Regulation \u2013 inside information.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Management Board of R.Power S.A., with its registered office in Warsaw (the \u201cIssuer\u201d), informs that on October 24, 2025, a subsidiary of the Issuer (the \u201cSubsidiary\u201d) entered into an agreement with a consortium of contractors consisting of Nomad Electric sp. z o.o., based in Warsaw, and Esix sp. z o.o., based in Wroc\u0142aw (the &hellip; <a href=\"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/\">Continued<\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[43,42,46],"tags":[],"class_list":["post-14827","post","type-post","status-publish","format-standard","hentry","category-espi","category-raport","category-raporty-biezace"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Current Report No. 22\/2025 \u2013 ESPI \u2013 Execution of a General Contracting Agreement with Nomad Electric sp. z o.o. and Esix sp. z o.o. - R.Power Renewables<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Current Report No. 22\/2025 \u2013 ESPI \u2013 Execution of a General Contracting Agreement with Nomad Electric sp. z o.o. and Esix sp. z o.o. - R.Power Renewables\" \/>\n<meta property=\"og:description\" content=\"The Management Board of R.Power S.A., with its registered office in Warsaw (the \u201cIssuer\u201d), informs that on October 24, 2025, a subsidiary of the Issuer (the \u201cSubsidiary\u201d) entered into an agreement with a consortium of contractors consisting of Nomad Electric sp. z o.o., based in Warsaw, and Esix sp. z o.o., based in Wroc\u0142aw (the &hellip; Continued\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/\" \/>\n<meta property=\"og:site_name\" content=\"R.Power Renewables\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-24T15:53:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-24T15:54:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/rpower.energy\/app\/uploads\/2021\/04\/2020-05-05-18.58.01.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"682\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"investor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"investor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\\\/\"},\"author\":{\"name\":\"investor\",\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/#\\\/schema\\\/person\\\/7288fd0913a520f4e7c4d0ad87d05428\"},\"headline\":\"Current Report No. 22\\\/2025 \u2013 ESPI \u2013 Execution of a General Contracting Agreement with Nomad Electric sp. z o.o. and Esix sp. z o.o.\",\"datePublished\":\"2025-10-24T15:53:45+00:00\",\"dateModified\":\"2025-10-24T15:54:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\\\/\"},\"wordCount\":226,\"publisher\":{\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/#organization\"},\"articleSection\":[\"espi\",\"Raport\",\"raporty bie\u017c\u0105ce\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\\\/\",\"url\":\"https:\\\/\\\/rpower.energy\\\/en\\\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\\\/\",\"name\":\"Current Report No. 22\\\/2025 \u2013 ESPI \u2013 Execution of a General Contracting Agreement with Nomad Electric sp. z o.o. and Esix sp. z o.o. - R.Power Renewables\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/#website\"},\"datePublished\":\"2025-10-24T15:53:45+00:00\",\"dateModified\":\"2025-10-24T15:54:19+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/rpower.energy\\\/en\\\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/rpower.energy\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Current Report No. 22\\\/2025 \u2013 ESPI \u2013 Execution of a General Contracting Agreement with Nomad Electric sp. z o.o. and Esix sp. z o.o.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/rpower.energy\\\/en\\\/\",\"name\":\"R.Power Renewables\",\"description\":\"The future of energy today.\",\"publisher\":{\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/rpower.energy\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/#organization\",\"name\":\"R.Power Renewables\",\"url\":\"https:\\\/\\\/rpower.energy\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/rpower.energy\\\/app\\\/uploads\\\/2021\\\/04\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/rpower.energy\\\/app\\\/uploads\\\/2021\\\/04\\\/favicon.png\",\"width\":512,\"height\":512,\"caption\":\"R.Power Renewables\"},\"image\":{\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/pl.linkedin.com\\\/company\\\/r-power-polska\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/rpower.energy\\\/en\\\/#\\\/schema\\\/person\\\/7288fd0913a520f4e7c4d0ad87d05428\",\"name\":\"investor\",\"url\":\"https:\\\/\\\/rpower.energy\\\/en\\\/author\\\/investor\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Current Report No. 22\/2025 \u2013 ESPI \u2013 Execution of a General Contracting Agreement with Nomad Electric sp. z o.o. and Esix sp. z o.o. - R.Power Renewables","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/","og_locale":"en_US","og_type":"article","og_title":"Current Report No. 22\/2025 \u2013 ESPI \u2013 Execution of a General Contracting Agreement with Nomad Electric sp. z o.o. and Esix sp. z o.o. - R.Power Renewables","og_description":"The Management Board of R.Power S.A., with its registered office in Warsaw (the \u201cIssuer\u201d), informs that on October 24, 2025, a subsidiary of the Issuer (the \u201cSubsidiary\u201d) entered into an agreement with a consortium of contractors consisting of Nomad Electric sp. z o.o., based in Warsaw, and Esix sp. z o.o., based in Wroc\u0142aw (the &hellip; Continued","og_url":"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/","og_site_name":"R.Power Renewables","article_published_time":"2025-10-24T15:53:45+00:00","article_modified_time":"2025-10-24T15:54:19+00:00","og_image":[{"width":1024,"height":682,"url":"https:\/\/rpower.energy\/app\/uploads\/2021\/04\/2020-05-05-18.58.01.jpg","type":"image\/jpeg"}],"author":"investor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"investor","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/#article","isPartOf":{"@id":"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/"},"author":{"name":"investor","@id":"https:\/\/rpower.energy\/en\/#\/schema\/person\/7288fd0913a520f4e7c4d0ad87d05428"},"headline":"Current Report No. 22\/2025 \u2013 ESPI \u2013 Execution of a General Contracting Agreement with Nomad Electric sp. z o.o. and Esix sp. z o.o.","datePublished":"2025-10-24T15:53:45+00:00","dateModified":"2025-10-24T15:54:19+00:00","mainEntityOfPage":{"@id":"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/"},"wordCount":226,"publisher":{"@id":"https:\/\/rpower.energy\/en\/#organization"},"articleSection":["espi","Raport","raporty bie\u017c\u0105ce"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/","url":"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/","name":"Current Report No. 22\/2025 \u2013 ESPI \u2013 Execution of a General Contracting Agreement with Nomad Electric sp. z o.o. and Esix sp. z o.o. - R.Power Renewables","isPartOf":{"@id":"https:\/\/rpower.energy\/en\/#website"},"datePublished":"2025-10-24T15:53:45+00:00","dateModified":"2025-10-24T15:54:19+00:00","breadcrumb":{"@id":"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/rpower.energy\/en\/current-report-no-22-2025-espi-execution-of-a-general-contracting-agreement-with-nomad-electric-sp-z-o-o-and-esix-sp-z-o-o\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/rpower.energy\/en\/"},{"@type":"ListItem","position":2,"name":"Current Report No. 22\/2025 \u2013 ESPI \u2013 Execution of a General Contracting Agreement with Nomad Electric sp. z o.o. and Esix sp. z o.o."}]},{"@type":"WebSite","@id":"https:\/\/rpower.energy\/en\/#website","url":"https:\/\/rpower.energy\/en\/","name":"R.Power Renewables","description":"The future of energy today.","publisher":{"@id":"https:\/\/rpower.energy\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rpower.energy\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/rpower.energy\/en\/#organization","name":"R.Power Renewables","url":"https:\/\/rpower.energy\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rpower.energy\/en\/#\/schema\/logo\/image\/","url":"https:\/\/rpower.energy\/app\/uploads\/2021\/04\/favicon.png","contentUrl":"https:\/\/rpower.energy\/app\/uploads\/2021\/04\/favicon.png","width":512,"height":512,"caption":"R.Power Renewables"},"image":{"@id":"https:\/\/rpower.energy\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/pl.linkedin.com\/company\/r-power-polska"]},{"@type":"Person","@id":"https:\/\/rpower.energy\/en\/#\/schema\/person\/7288fd0913a520f4e7c4d0ad87d05428","name":"investor","url":"https:\/\/rpower.energy\/en\/author\/investor\/"}]}},"_links":{"self":[{"href":"https:\/\/rpower.energy\/en\/wp-json\/wp\/v2\/posts\/14827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rpower.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rpower.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rpower.energy\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/rpower.energy\/en\/wp-json\/wp\/v2\/comments?post=14827"}],"version-history":[{"count":2,"href":"https:\/\/rpower.energy\/en\/wp-json\/wp\/v2\/posts\/14827\/revisions"}],"predecessor-version":[{"id":14829,"href":"https:\/\/rpower.energy\/en\/wp-json\/wp\/v2\/posts\/14827\/revisions\/14829"}],"wp:attachment":[{"href":"https:\/\/rpower.energy\/en\/wp-json\/wp\/v2\/media?parent=14827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rpower.energy\/en\/wp-json\/wp\/v2\/categories?post=14827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rpower.energy\/en\/wp-json\/wp\/v2\/tags?post=14827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}